The
original 2010 architectural plans for the
Mission Arts centre included plans for a future
Stage 2 development, and indeed envisaged a further
Stage 3 expansion northwards. Unfortunately, the subsequent construction of the co-located
Mission Beach Aquatic Centre has precluded the Stage 3 expansion, with further expansion beyond Stage 2 now limited to eastward expansion beyond the former Girl Guild House, along with a small infill opportunity to the west.
Due to increasing pressure on space, the Stage 2 plans were revisited in 2020, with more detailed Master Plan, needs analysis, design brief and design development plans
delivered in 2021, following community and stakeholder consultation and high levels of support for the initiative. The current update to these plans are
available here.
The overall Stage 2 programme comprises a number of separable projects that can each be executed individually, progressively as funding opportunities arise, or could be grouped together into a smaller number of larger projects. Grouped by zone, the Stage 2 projects comprise:
Eastern Zone
- Reconfigure Pottery Courtyard [done 2022]
- Separate kiln shed
- Disabled parking
- Disabled access ramp to Stage 2 development
Southern Zone
- Rectify trip hazards [done 2022]
- Southern amphitheatre
- Sculpture Garden
Western Zone
- Integrate Mission Arts and Aquatic Centre entrances
- Extend MA Shop
- Covered entrance walkway
Northern Zone
- Build Pods 6, 7 and 8, including
- Accessible on-site toilet
- Outer Roof, to match existing Stage 1 building
- Additional verandahs